Go to www.forthecommondefense.org/reports to view detailed reports on Ohio counties, cities, Congressional Districts, industries, small businesses and information on sources and methodology.
BACKGROUND ON THE DEFENSE BUDGET CUTS: 2013-2021
|
State | County | Contract Year | Product or Service | $ Amount | Reduction by 9.0% | Reduction by 18.0% |
Ohio | Summit | 2011 | ACFT Hydraulic, Vacuum & DE-Icing Sys Comp | $430,604 | -$38,754 | -$77,509 |
Ohio | Summit | 2011 | Adhesives | $12,165 | -$1,095 | -$2,190 |
Ohio | Summit | 2011 | ADP Centrl Processing Unit (CPU Computer), Digital | $11,344 | -$1,021 | -$2,042 |
Ohio | Summit | 2011 | ADP Components | $29,903 | -$2,691 | -$5,383 |
Ohio | Summit | 2011 | ADP Input/Output and Storage Devices | $116,511 | -$10,486 | -$20,972 |
Ohio | Summit | 2011 | ADP Software | $25,931 | -$2,334 | -$4,668 |
Ohio | Summit | 2011 | ADP Support Equip | $133,598 | -$12,024 | -$24,048 |
Ohio | Summit | 2011 | ADP Teleprocessing & Timesharing Services | $8,016 | -$721 | -$1,443 |
Ohio | Summit | 2011 | ADPE System Configuration | $39,720 | -$3,575 | -$7,150 |
Ohio | Summit | 2011 | Aircraft AC, Heating, And Pressurizing Equipment | $519,887 | -$46,790 | -$93,580 |
Ohio | Summit | 2011 | Aircraft Ground Servicing Equipment | $21,215 | -$1,909 | -$3,819 |
Ohio | Summit | 2011 | Aircraft Landing Equipment | $3,800 | -$342 | -$684 |
Ohio | Summit | 2011 | Aircraft Landing Gear Components | $83,450 | -$7,511 | -$15,021 |
Ohio | Summit | 2011 | Aircraft Wheel and Brake Systems | $28,371,604 | -$2,553,444 | -$5,106,889 |
Ohio | Summit | 2011 | Airframe Structural Components | $646,187 | -$58,157 | -$116,314 |
Ohio | Summit | 2011 | Antennas, Waveguides & Related Equipment | $71,059 | -$6,395 | -$12,791 |
Ohio | Summit | 2011 | Athletic and Sporting Equipment | $136,691 | -$12,302 | -$24,604 |
Ohio | Summit | 2011 | Bars and Rods, Iron & Steel | $6,930 | -$624 | -$1,247 |
Ohio | Summit | 2011 | Bars and Rods, Nonferrous Base Metal | $40,500 | -$3,645 | -$7,290 |
Ohio | Summit | 2011 | Bearings, Antifriction, Unmounted | $32,890 | -$2,960 | -$5,920 |
Ohio | Summit | 2011 | Bearings, Plain, Unmounted | $204,866 | -$18,438 | -$36,876 |
Ohio | Summit | 2011 | Bolts | $72,342 | -$6,511 | -$13,022 |
Ohio | Summit | 2011 | Brooms, Brushes, Mops, And Sponges | $496 | -$45 | -$89 |
Ohio | Summit | 2011 | Cabinets, Lockers, Bins, And Shelving | $3,770 | -$339 | -$679 |
Ohio | Summit | 2011 | Cable, Cord, Wire Assemblies: Comm Equip | $6,300 | -$567 | -$1,134 |
Ohio | Summit | 2011 | Cameras, Motion Picture | $12,628 | -$1,137 | -$2,273 |
Ohio | Summit | 2011 | Capacitors | $40,697 | -$3,663 | -$7,325 |
Ohio | Summit | 2011 | Centrifugals, Separators, And Press and Vac Filt | $291,646 | -$26,248 | -$52,496 |
Ohio | Summit | 2011 | Chemical Analysis Instruments | $6,764 | -$609 | -$1,218 |
Ohio | Summit | 2011 | Chemicals | $451 | -$41 | -$81 |
Ohio | Summit | 2011 | Coil, Flat, And Wire Springs | $39,850 | -$3,587 | -$7,173 |
Ohio | Summit | 2011 | Coils and Transformers | $7,888 | -$710 | -$1,420 |
Ohio | Summit | 2011 | Communications Security Equip and Comps | $16,400 | -$1,476 | -$2,952 |
Ohio | Summit | 2011 | Compressors and Vacuum Pumps | $35,883 | -$3,229 | -$6,459 |
Ohio | Summit | 2011 | Connectors, Electrical | $1,161 | -$104 | -$209 |
Ohio | Summit | 2011 | Custodial - Janitorial Services | $17,389 | -$1,565 | -$3,130 |
Ohio | Summit | 2011 | Cutting Tools for Machine Tools | $74,600 | -$6,714 | -$13,428 |
Ohio | Summit | 2011 | Cutting Tools for Secondary Metal Mach | $118,000 | -$10,620 | -$21,240 |
Ohio | Summit | 2011 | Diesel Engines and Components | $54,096 | -$4,869 | -$9,737 |
Ohio | Summit | 2011 | Drawings and Specifications | $19,125 | -$1,721 | -$3,443 |
Ohio | Summit | 2011 | Earth Moving and Excavating Equipment | $269,204 | -$24,228 | -$48,457 |
Ohio | Summit | 2011 | Ecclesiastical Equip, Furnishings & Sup | $11,538 | -$1,038 | -$2,077 |
Ohio | Summit | 2011 | Elct Cntrmsrs, Cntr-Cntr-MSRS & QCK RCTN Cpblty Eq | $1,435,393 | -$129,185 | -$258,371 |
Ohio | Summit | 2011 | Electrical & Elct Boards, Cards & Asscted Hrdwre | $595,266 | -$53,574 | -$107,148 |
Ohio | Summit | 2011 | Electrical & Elct Properties Meas & Tst Instrumnts | $47,284 | -$4,256 | -$8,511 |
Ohio | Summit | 2011 | Electrical Contact Brushes & Electrodes | $15,318 | -$1,379 | -$2,757 |
Ohio | Summit | 2011 | Electrical Control Equipment | $363,401 | -$32,706 | -$65,412 |
Ohio | Summit | 2011 | Electrical Hardware and Supplies | $25,205 | -$2,268 | -$4,537 |
Ohio | Summit | 2011 | Eng Air & Oil Fil, Strainers, & Cleaners, Nonacft | $80,973 | -$7,288 | -$14,575 |
Ohio | Summit | 2011 | Eng Air & Oil Filters, Cleaners, ACFT Prime Moving | $194,577 | -$17,512 | -$35,024 |
Ohio | Summit | 2011 | Engine Cooling Sys Comps, Nonaircraft | $10,533 | -$948 | -$1,896 |
Ohio | Summit | 2011 | Engine Electrical Sys Comps, Aircraft Prime Moving | $1,099,980 | -$98,998 | -$197,996 |
Ohio | Summit | 2011 | Engine Electrical Sys Comps, Nonaircraft | $206,465 | -$18,582 | -$37,164 |
Ohio | Summit | 2011 | Engine Fuel Sys Components, Nonaircraft | $100,093 | -$9,008 | -$18,017 |
Ohio | Summit | 2011 | Engine Fuel System Components, Aircraft & Missile | $42,560 | -$3,830 | -$7,661 |
Ohio | Summit | 2011 | Engineering Technical Services | $425,144 | -$38,263 | -$76,526 |
Ohio | Summit | 2011 | Evaluation & Screening | $1,185 | -$107 | -$213 |
Ohio | Summit | 2011 | Facilities Operations Support Services | $11,012 | -$991 | -$1,982 |
Ohio | Summit | 2011 | Fastening Devices | $38,770 | -$3,489 | -$6,979 |
Ohio | Summit | 2011 | Fiber Optic Cable Assemblies and Harnesses | $15,494 | -$1,394 | -$2,789 |
Ohio | Summit | 2011 | Filters and Networks | $29,454 | -$2,651 | -$5,302 |
Ohio | Summit | 2011 | Fittings and Specialties; Hose, Pipe, Tube | $115,063 | -$10,356 | -$20,711 |
Ohio | Summit | 2011 | Food, Oils and Fats | $4,583 | -$412 | -$825 |
Ohio | Summit | 2011 | Fuel Burning Equipment Units | $12,975 | -$1,168 | -$2,336 |
Ohio | Summit | 2011 | Gas Turbines and Jet Engines, ACFT & Comps | $82,974 | -$7,468 | -$14,935 |
Ohio | Summit | 2011 | Gases, Compressed and Liquefied | $259,250 | -$23,333 | -$46,665 |
Ohio | Summit | 2011 | Gears, Pulleys, Sprockets and Trans Chain | $75,224 | -$6,770 | -$13,540 |
Ohio | Summit | 2011 | Generators and Generator Sets, Electrical | $1,021,640 | -$91,948 | -$183,895 |
Ohio | Summit | 2011 | Guided Missile Components | $970,540 | -$87,349 | -$174,697 |
Ohio | Summit | 2011 | Hardware, Weapon System | $12,699 | -$1,143 | -$2,286 |
Ohio | Summit | 2011 | Hazard-Detecting Instruments & Apparatus | $1,477,420 | -$132,968 | -$265,936 |
Ohio | Summit | 2011 | Hazardous Mat Spill Cont & Clean-Up Eq & Mat | $17,012 | -$1,531 | -$3,062 |
Ohio | Summit | 2011 | Hose and Tubing, Flexible | $380,550 | -$34,250 | -$68,499 |
Ohio | Summit | 2011 | Laboratory Equipment & Supplies | $17,700 | -$1,593 | -$3,186 |
Ohio | Summit | 2011 | Landscaping/Groundskeeping Services | $8,925 | -$803 | -$1,607 |
Ohio | Summit | 2011 | Liq & Gas Flow, Liq LVL, & Mech Motion Meas Instru | $33,618 | -$3,026 | -$6,051 |
Ohio | Summit | 2011 | Liquid Propellants & Fuel, Petroleum Base | $25,300 | -$2,277 | -$4,554 |
Ohio | Summit | 2011 | Lodging - Hotel/Motel | $104,775 | -$9,430 | -$18,860 |
Ohio | Summit | 2011 | Lugs, Terminals, And Terminal Strips | $136,619 | -$12,296 | -$24,591 |
Ohio | Summit | 2011 | Maint & Repair of Eq/Construction Equipment | $26,082 | -$2,347 | -$4,695 |
Ohio | Summit | 2011 | Maint & Repair of Eq/Instruments & Lab Equipment | $300,000 | -$27,000 | -$54,000 |
Ohio | Summit | 2011 | Maint & Repair of Eq/Mech Power Trans Equipment | $147,980 | -$13,318 | -$26,636 |
Ohio | Summit | 2011 | Maint & Repair of Eq/Medical & Dental Equipment | $141,249 | -$12,712 | -$25,425 |
Ohio | Summit | 2011 | Maint & Repair of Eq/Metal Bars & Sheets | $27,650 | -$2,489 | -$4,977 |
Ohio | Summit | 2011 | Maint & Repair of Eq/Special Industry Machinery | $41,396 | -$3,726 | -$7,451 |
Ohio | Summit | 2011 | Maint/Highways, Roads, Streets, & Bridges | $276,314 | -$24,868 | -$49,737 |
Ohio | Summit | 2011 | Mat Handling Equip, Nonself-Propelled | $10,065 | -$906 | -$1,812 |
Ohio | Summit | 2011 | Medical & Surgical Instruments, Equip & Supplies | $9,915 | -$892 | -$1,785 |
Ohio | Summit | 2011 | Misc Electric Power & Distribution Eq | $8,259 | -$743 | -$1,487 |
Ohio | Summit | 2011 | Misc Electrical & Electronic Components | $11,534 | -$1,038 | -$2,076 |
Ohio | Summit | 2011 | Misc Service and Trade Equipment | $4,708 | -$424 | -$847 |
Ohio | Summit | 2011 | Miscellaneous Communication Equipment | $41,185 | -$3,707 | -$7,413 |
Ohio | Summit | 2011 | Miscellaneous Engine Accessories, Aircraft | $16,740 | -$1,507 | -$3,013 |
Ohio | Summit | 2011 | Miscellaneous Engines and Components | $3,234 | -$291 | -$582 |
Ohio | Summit | 2011 | Miscellaneous Furniture and Fixtures | $36,974 | -$3,328 | -$6,655 |
Ohio | Summit | 2011 | Miscellaneous Hardware | $482,031 | -$43,383 | -$86,766 |
Ohio | Summit | 2011 | Miscellaneous Maint & Repair Shop Specilized Eq | $106,175 | -$9,556 | -$19,112 |
Ohio | Summit | 2011 | Miscellaneous Materials Handling Equip | $102,135 | -$9,192 | -$18,384 |
Ohio | Summit | 2011 | Miscellaneous Office Machines | $4,100 | -$369 | -$738 |
Ohio | Summit | 2011 | Miscellaneous Power Transmission Equip | $17,632 | -$1,587 | -$3,174 |
Ohio | Summit | 2011 | Miscellaneous Special Industry Machinery | $55,775 | -$5,020 | -$10,040 |
Ohio | Summit | 2011 | Miscellaneous Vehicular Components | $375,516 | -$33,796 | -$67,593 |
Ohio | Summit | 2011 | Motor Veh Maint & Repr Shop Specilized Eq | $99,417 | -$8,948 | -$17,895 |
Ohio | Summit | 2011 | Motors, Electrical | $17,712 | -$1,594 | -$3,188 |
Ohio | Summit | 2011 | MSL Aircraft Accessories and Components | $81,555 | -$7,340 | -$14,680 |
Ohio | Summit | 2011 | Nails, Keys, And Pins | $379,700 | -$34,173 | -$68,346 |
Ohio | Summit | 2011 | Night Vision Equipment, Emitted and Reflect Radia | $9,256 | -$833 | -$1,666 |
Ohio | Summit | 2011 | Nuts and Washers | $487,636 | -$43,887 | -$87,774 |
Ohio | Summit | 2011 | Optical Instruments, Test Equip, Comps & Accys | $671,870 | -$60,468 | -$120,937 |
Ohio | Summit | 2011 | O-Ring | $483,367 | -$43,503 | -$87,006 |
Ohio | Summit | 2011 | Oscillators & Piezoelectric Crystals | $31,170 | -$2,805 | -$5,611 |
Ohio | Summit | 2011 | Other Administrative & Service Buildings | $1,432,922 | -$128,963 | -$257,926 |
Ohio | Summit | 2011 | Other Education & Training Services | $7,500 | -$675 | -$1,350 |
Ohio | Summit | 2011 | Other Environ SVCS, Studies, & Analytical Support | $57,505 | -$5,175 | -$10,351 |
Ohio | Summit | 2011 | Other Professional Services | $15,872 | -$1,428 | -$2,857 |
Ohio | Summit | 2011 | Packing and Gasket Materials | $722,572 | -$65,031 | -$130,063 |
Ohio | Summit | 2011 | Paints, Dopes, Varnishes, & Related Product | $2,198 | -$198 | -$396 |
Ohio | Summit | 2011 | Phonograph Records | $30,072 | -$2,706 | -$5,413 |
Ohio | Summit | 2011 | Photographic Equipment and Accessories | $4,810 | -$433 | -$866 |
Ohio | Summit | 2011 | Physical Properties Testing Equipment | $309,739 | -$27,877 | -$55,753 |
Ohio | Summit | 2011 | Pipe and Tube | $184,529 | -$16,608 | -$33,215 |
Ohio | Summit | 2011 | Plate, Sheet, Strip, & Foil: Nonferrous Base Metal | $28,321 | -$2,549 | -$5,098 |
Ohio | Summit | 2011 | Plate, Sheet, Strip, Foil; Iron and Steel | $104,524 | -$9,407 | -$18,814 |
Ohio | Summit | 2011 | Power and Hand Pumps | $33,416 | -$3,007 | -$6,015 |
Ohio | Summit | 2011 | Pressure, Temp, & Humidity Meas & Contrling Instru | $21,459 | -$1,931 | -$3,863 |
Ohio | Summit | 2011 | Printing, Duplicating & Bookbinding Equip | $19,095 | -$1,719 | -$3,437 |
Ohio | Summit | 2011 | Quality Control SVCS/Fuels-Lubricants-Oils | $3,350 | -$302 | -$603 |
Ohio | Summit | 2011 | Radar Equipment, Airborne | $335,226,667 | -$30,170,401 | -$60,340,802 |
Ohio | Summit | 2011 | RDTE/Aircraft-Eng/Manuf Develop | $1,841,698 | -$165,753 | -$331,506 |
Ohio | Summit | 2011 | RDTE/Electronics & Communication Eq-Applied Resea | $1,523,328 | -$137,100 | -$274,199 |
Ohio | Summit | 2011 | RDTE/Electronics & Communication Eq-Basic Research | $31,500 | -$2,835 | -$5,670 |
Ohio | Summit | 2011 | RDTE/Manufacturing Technology-Basic Research | $98,000 | -$8,820 | -$17,640 |
Ohio | Summit | 2011 | RDTE/Manufacturing Technology-Eng/Manuf Devel | $50,000 | -$4,500 | -$9,000 |
Ohio | Summit | 2011 | RDTE/Missile and Space Systems-Basic Research | $2,750,000 | -$247,500 | -$495,000 |
Ohio | Summit | 2011 | RDTE/Other Defense-Adv Tech Dev | $3,739,766 | -$336,579 | -$673,158 |
Ohio | Summit | 2011 | RDTE/Other Defense-Applied Research | $1,042,355 | -$93,812 | -$187,624 |
Ohio | Summit | 2011 | RDTE/Other Research & Development-Adv Tech Dev | $99,924 | -$8,993 | -$17,986 |
Ohio | Summit | 2011 | RDTE/Other Research & Development-Applied Researc | $9,189,065 | -$827,016 | -$1,654,032 |
Ohio | Summit | 2011 | RDTE/Other Research & Development-Basic Research | $100,000 | -$9,000 | -$18,000 |
Ohio | Summit | 2011 | RDTE/Other Research & Development-Demo/Valid | $964,457 | -$86,801 | -$173,602 |
Ohio | Summit | 2011 | RDTE/Services-Basic Research | $79,953 | -$7,196 | -$14,392 |
Ohio | Summit | 2011 | RDTE/Services-Eng/Manuf Develop | $103,427 | -$9,308 | -$18,617 |
Ohio | Summit | 2011 | RDTE/Services-Management Support | $6,257 | -$563 | -$1,126 |
Ohio | Summit | 2011 | Recreational and Gymnastic Equipment | $1,194,461 | -$107,501 | -$215,003 |
Ohio | Summit | 2011 | Refrigeration and Air Conditioning Comps | $36,250 | -$3,263 | -$6,525 |
Ohio | Summit | 2011 | Relays and Solenoids | $62,346 | -$5,611 | -$11,222 |
Ohio | Summit | 2011 | Rings, Shims, And Spacers | $954,727 | -$85,925 | -$171,851 |
Ohio | Summit | 2011 | Rubber Fabricated Materials | $107,600 | -$9,684 | -$19,368 |
Ohio | Summit | 2011 | Screws | $63,779 | -$5,740 | -$11,480 |
Ohio | Summit | 2011 | Semiconductor Devices & Assoc Hardware | $506,012 | -$45,541 | -$91,082 |
Ohio | Summit | 2011 | Sets, Kits, And Outfits of Hand Tools | $3,612 | -$325 | -$650 |
Ohio | Summit | 2011 | Sound Recording & Reproducing Equipment | $20,389 | -$1,835 | -$3,670 |
Ohio | Summit | 2011 | Specilized Test and Handling Eq, Nucl Ord | $348 | -$31 | -$63 |
Ohio | Summit | 2011 | Surface Use Explo Ord Disposal Tools & Eq | $24,435 | -$2,199 | -$4,398 |
Ohio | Summit | 2011 | Switches | $15,454 | -$1,391 | -$2,782 |
Ohio | Summit | 2011 | Technical Assistance | $12,033 | -$1,083 | -$2,166 |
Ohio | Summit | 2011 | Tires & Tubes, Pneumatic, Except Aircraft | $291,678 | -$26,251 | -$52,502 |
Ohio | Summit | 2011 | Tires, Solid and Cushion | $6,556 | -$590 | -$1,180 |
Ohio | Summit | 2011 | Torque Converters and Speed Changers | $25,228 | -$2,271 | -$4,541 |
Ohio | Summit | 2011 | Training Aids | $160,435 | -$14,439 | -$28,878 |
Ohio | Summit | 2011 | Transformers: Distribution & Power Station | $3,478 | -$313 | -$626 |
Ohio | Summit | 2011 | Translation & Interpreting Services | $8,900 | -$801 | -$1,602 |
Ohio | Summit | 2011 | Valves, Nonpowered | $58,260 | -$5,243 | -$10,487 |
Ohio | Summit | 2011 | Valves, Powered | $4,455 | -$401 | -$802 |
Ohio | Summit | 2011 | Vehicular Brake, Steering, Axle Wheel Comp | $78,779,243 | -$7,090,132 | -$14,180,264 |
Ohio | Summit | 2011 | Vehicular Power Transmission Components | $98,697 | -$8,883 | -$17,765 |
Ohio | Summit | 2011 | Warehouse Trks & Tractors, Self-Propelled | $3,077 | -$277 | -$554 |
Ohio | Summit | 2011 | Winches, Hoists, Cranes, And Derricks | $109,934 | -$9,894 | -$19,788 |
Ohio | Summit | 2011 | Wrapping and Packaging Machinery | $4,100 | -$369 | -$738 |
Ohio | Summit | 2011 | X-Ray Equip & Sup: Medical, Dental, & Vet | $5,546 | -$499 | -$998 | TOTAL | $488,435,719 | -$43,959,217 | -$87,918,438 |
Data sources and more data available at www.governmentcontractswon.com, compiled from public data at www.fpds.gov
Created by the Center for Security Policy
Defense Breakdown Economic Impact Report Generator (v.2.7.0-PoP) February 21, 2013 01:52:35 www.forthecommondefense.org