Go to www.forthecommondefense.org/reports to view detailed reports on Washington counties, cities, Congressional Districts, industries, small businesses and information on sources and methodology.
BACKGROUND ON THE DEFENSE BUDGET CUTS: 2013-2021
|
State | City | Contract Year | Product or Service | $ Amount | Reduction by 9.0% | Reduction by 18.0% |
Washington | Bothell | 2011 | ACFT Maint & Repair Shop Specilized Equip | $158,318 | -$14,249 | -$28,497 |
Washington | Bothell | 2011 | ADP Centrl Processing Unit (CPU Computer), Digital | $17,953 | -$1,616 | -$3,232 |
Washington | Bothell | 2011 | ADP Software | $85,056 | -$7,655 | -$15,310 |
Washington | Bothell | 2011 | ADPE System Configuration | $194,244 | -$17,482 | -$34,964 |
Washington | Bothell | 2011 | Aircraft Landing Gear Components | $106,631 | -$9,597 | -$19,194 |
Washington | Bothell | 2011 | Airframe Structural Components | $698,425 | -$62,858 | -$125,717 |
Washington | Bothell | 2011 | Ammunition, Through 30 MM | $35,184 | -$3,167 | -$6,333 |
Washington | Bothell | 2011 | Amplifiers | $561,481 | -$50,533 | -$101,067 |
Washington | Bothell | 2011 | Antennas, Waveguides & Related Equipment | $15,300 | -$1,377 | -$2,754 |
Washington | Bothell | 2011 | Architect-Engineering Services | $37,478 | -$3,373 | -$6,746 |
Washington | Bothell | 2011 | Bearings, Antifriction, Unmounted | $120 | -$11 | -$22 |
Washington | Bothell | 2011 | Bearings, Mounted | $92,484 | -$8,324 | -$16,647 |
Washington | Bothell | 2011 | Bearings, Plain, Unmounted | $54,315 | -$4,888 | -$9,777 |
Washington | Bothell | 2011 | Blocks Tackle Rigging and Slings | $4,434 | -$399 | -$798 |
Washington | Bothell | 2011 | Bolts | $15,910 | -$1,432 | -$2,864 |
Washington | Bothell | 2011 | Cable, Cord, Wire Assemblies: Comm Equip | $77,948 | -$7,015 | -$14,031 |
Washington | Bothell | 2011 | Cartridge & Propellant Actuated DV & Comps | $917,334 | -$82,560 | -$165,120 |
Washington | Bothell | 2011 | Chemical/Biological Studies & Analyses | $2,467 | -$222 | -$444 |
Washington | Bothell | 2011 | Custodial - Janitorial Services | $39,000 | -$3,510 | -$7,020 |
Washington | Bothell | 2011 | Dental Instruments, Equip, And Supplies | $42,000 | -$3,780 | -$7,560 |
Washington | Bothell | 2011 | Elct Cntrmsrs, Cntr-Cntr-MSRS & QCK RCTN Cpblty Eq | $15,800 | -$1,422 | -$2,844 |
Washington | Bothell | 2011 | Electric Vehicular Lights and Fixtures | $11,857 | -$1,067 | -$2,134 |
Washington | Bothell | 2011 | Electrical & Elct Boards, Cards & Asscted Hrdwre | $47,644 | -$4,288 | -$8,576 |
Washington | Bothell | 2011 | Electrical & Elct Properties Meas & Tst Instrumnts | $488,070 | -$43,926 | -$87,853 |
Washington | Bothell | 2011 | Fastening Devices | $6,143 | -$553 | -$1,106 |
Washington | Bothell | 2011 | Fittings for Rope, Cable, And Chain | $27,430 | -$2,469 | -$4,937 |
Washington | Bothell | 2011 | Guided Missile Components | $89,811 | -$8,083 | -$16,166 |
Washington | Bothell | 2011 | Guided MSL Warheads and Explosive Comps | $225,574 | -$20,302 | -$40,603 |
Washington | Bothell | 2011 | Hand Tools, Nonedged, Nonpowered | $48,135 | -$4,332 | -$8,664 |
Washington | Bothell | 2011 | Hardware, Weapon System | $58,754 | -$5,288 | -$10,576 |
Washington | Bothell | 2011 | Hospital Furniture, Equip, Utensils, & Sup | $4,254 | -$383 | -$766 |
Washington | Bothell | 2011 | Inspection Gages & Precision Layout Tools | $7,590 | -$683 | -$1,366 |
Washington | Bothell | 2011 | Laboratory Equipment & Supplies | $23,188 | -$2,087 | -$4,174 |
Washington | Bothell | 2011 | Lugs, Terminals, And Terminal Strips | $24,230 | -$2,181 | -$4,361 |
Washington | Bothell | 2011 | Maint & Repair of Eq/Instruments & Lab Equipment | $15,756 | -$1,418 | -$2,836 |
Washington | Bothell | 2011 | Maint & Repair of Eq/Medical & Dental Equipment | $444,479 | -$40,003 | -$80,006 |
Washington | Bothell | 2011 | Maint & Repair of Eq/Miscellaneous Equipment | $4,680 | -$421 | -$842 |
Washington | Bothell | 2011 | Maint & Repair of Eq/Refrigeration, Air Cond Equip | $22,670 | -$2,040 | -$4,081 |
Washington | Bothell | 2011 | Marine Lifesaving and Diving Equipment | $1,739 | -$157 | -$313 |
Washington | Bothell | 2011 | Medical & Surgical Instruments, Equip & Supplies | $19,259,542 | -$1,733,359 | -$3,466,718 |
Washington | Bothell | 2011 | Misc Electrical & Electronic Components | $1,064,336 | -$95,790 | -$191,580 |
Washington | Bothell | 2011 | Misc Service and Trade Equipment | $8,998 | -$810 | -$1,620 |
Washington | Bothell | 2011 | Miscellaneous Construction Equipment | $30,118 | -$2,711 | -$5,421 |
Washington | Bothell | 2011 | Miscellaneous Power Transmission Equip | $47,148 | -$4,243 | -$8,487 |
Washington | Bothell | 2011 | Miscellaneous Vehicular Components | $5,013,924 | -$451,253 | -$902,506 |
Washington | Bothell | 2011 | Modification of Eq/Miscellaneous Equipment | $29,000 | -$2,610 | -$5,220 |
Washington | Bothell | 2011 | MSL Aircraft Accessories and Components | $65,160 | -$5,864 | -$11,729 |
Washington | Bothell | 2011 | Nails, Keys, And Pins | $6,906 | -$622 | -$1,243 |
Washington | Bothell | 2011 | Nuts and Washers | $47,069 | -$4,236 | -$8,472 |
Washington | Bothell | 2011 | Office Furniture | $62,998 | -$5,670 | -$11,340 |
Washington | Bothell | 2011 | Other ADP & Telecommunication Services | $3,223 | -$290 | -$580 |
Washington | Bothell | 2011 | Other Professional Services | $1,234,596 | -$111,114 | -$222,227 |
Washington | Bothell | 2011 | Pipe and Tube | $108 | -$10 | -$19 |
Washington | Bothell | 2011 | Pressure, Temp, & Humidity Meas & Contrling Instru | $25,433 | -$2,289 | -$4,578 |
Washington | Bothell | 2011 | Radio & TV Comm Equipment, Except Airborne | $555,101 | -$49,959 | -$99,918 |
Washington | Bothell | 2011 | RDTE/Aircraft-Management Support | $441,447 | -$39,730 | -$79,460 |
Washington | Bothell | 2011 | RDTE/Electronics & Communication Eq-Applied Resea | $249,865 | -$22,488 | -$44,976 |
Washington | Bothell | 2011 | RDTE/Missile and Space Systems-Adv Tech Dev | $10,593,809 | -$953,443 | -$1,906,886 |
Washington | Bothell | 2011 | RDTE/Missile and Space Systems-Basic Research | $1,854,489 | -$166,904 | -$333,808 |
Washington | Bothell | 2011 | RDTE/Other Medical - Basic Research | $3,059,000 | -$275,310 | -$550,620 |
Washington | Bothell | 2011 | RDTE/Ships-Applied Research | $199,881 | -$17,989 | -$35,979 |
Washington | Bothell | 2011 | RDTE/Space Flight - Basic Research | $199,999 | -$18,000 | -$36,000 |
Washington | Bothell | 2011 | RDTE/Weapons-Applied Research | $596,106 | -$53,650 | -$107,299 |
Washington | Bothell | 2011 | Relays and Solenoids | $9,729 | -$876 | -$1,751 |
Washington | Bothell | 2011 | Replenishable Field Mdical Sets, Kits, And Outfits | $2,090,055 | -$188,105 | -$376,210 |
Washington | Bothell | 2011 | Rivets | $14,624 | -$1,316 | -$2,632 |
Washington | Bothell | 2011 | Screws | $8,567 | -$771 | -$1,542 |
Washington | Bothell | 2011 | Semiconductor Devices & Assoc Hardware | $235,173 | -$21,166 | -$42,331 |
Washington | Bothell | 2011 | Tech Rep SVCS/Miscellaneous Equipment | $14,000 | -$1,260 | -$2,520 |
Washington | Bothell | 2011 | Technical Assistance | $83,767 | -$7,539 | -$15,078 |
Washington | Bothell | 2011 | Torpedo Inert Components | $12,920 | -$1,163 | -$2,326 |
Washington | Bothell | 2011 | Valves, Nonpowered | $21,101 | -$1,899 | -$3,798 |
Washington | Bothell | 2011 | Wallboard, Bldg Paper, & Thermal Insulation Mat | $2,999 | -$270 | -$540 |
Washington | Bothell | 2011 | Wrapping and Packaging Machinery | $271,920 | -$24,473 | -$48,946 |
Washington | Bothell | 2011 | X-Ray Equip & Sup: Medical, Dental, & Vet | $67,093,937 | -$6,038,455 | -$12,076,909 | TOTAL | $119,230,934 | -$10,730,788 | -$21,461,570 |
Data sources and more data available at www.governmentcontractswon.com, compiled from public data at www.fpds.gov
Created by the Center for Security Policy
Defense Breakdown Economic Impact Report Generator (v.2.7.0-PoP) February 21, 2013 01:40:48 www.forthecommondefense.org