All Reports | Return to Place of Performance | Return to State Index | FAQ Page | USA Summary Reports |
Go to www.forthecommondefense.org/reports to view detailed reports on Florida counties, cities, Congressional Districts, industries, small businesses and information on sources and methodology.
State | City | Contract Year | Product or Service | $ Amount | Reduction by 9.0% | Reduction by 18.0% |
Florida | Fort Walton Beach | 2010 | ACFT Hydraulic, Vacuum & DE-Icing Sys Comp | $1,173,207 | -$105,589 | -$211,177 |
Florida | Fort Walton Beach | 2010 | ACFT Maint & Repair Shop Specilized Equip | $4,262,914 | -$383,662 | -$767,325 |
Florida | Fort Walton Beach | 2010 | ADP Input/Output and Storage Devices | $7,779 | -$700 | -$1,400 |
Florida | Fort Walton Beach | 2010 | ADP Support Equip | $277,541 | -$24,979 | -$49,957 |
Florida | Fort Walton Beach | 2010 | ADP System Acquisition Support Services | $4,527,528 | -$407,478 | -$814,955 |
Florida | Fort Walton Beach | 2010 | ADPE System Configuration | $75,625 | -$6,806 | -$13,613 |
Florida | Fort Walton Beach | 2010 | Air Conditioning Equip | $14,996 | -$1,350 | -$2,699 |
Florida | Fort Walton Beach | 2010 | Aircraft Ground Servicing Equipment | $681,260 | -$61,313 | -$122,627 |
Florida | Fort Walton Beach | 2010 | Aircraft Gunnery Fire Control Components | $328,875 | -$29,599 | -$59,198 |
Florida | Fort Walton Beach | 2010 | Airframe Structural Components | $3,822,291 | -$344,006 | -$688,012 |
Florida | Fort Walton Beach | 2010 | Ammunition Maint, Repr, & Checkout Spec Eq | $21,600 | -$1,944 | -$3,888 |
Florida | Fort Walton Beach | 2010 | Amplifiers | $74,680 | -$6,721 | -$13,442 |
Florida | Fort Walton Beach | 2010 | Antennas, Waveguides & Related Equipment | $245,661 | -$22,109 | -$44,219 |
Florida | Fort Walton Beach | 2010 | Armament Training Devices | $35,980 | -$3,238 | -$6,476 |
Florida | Fort Walton Beach | 2010 | Bakery and Cereal Products | $15,504 | -$1,395 | -$2,791 |
Florida | Fort Walton Beach | 2010 | Blocks Tackle Rigging and Slings | $23,343 | -$2,101 | -$4,202 |
Florida | Fort Walton Beach | 2010 | Brackets | $26,730 | -$2,406 | -$4,811 |
Florida | Fort Walton Beach | 2010 | Cable, Cord, Wire Assemblies: Comm Equip | $636,542 | -$57,289 | -$114,578 |
Florida | Fort Walton Beach | 2010 | Coils and Transformers | $6,500 | -$585 | -$1,170 |
Florida | Fort Walton Beach | 2010 | Combination & Miscellaneous Instruments | $35,385 | -$3,185 | -$6,369 |
Florida | Fort Walton Beach | 2010 | Connectors, Electrical | $52,261 | -$4,703 | -$9,407 |
Florida | Fort Walton Beach | 2010 | Educational Services | $100,001 | -$9,000 | -$18,000 |
Florida | Fort Walton Beach | 2010 | Elct Cntrmsrs, Cntr-Cntr-MSRS & QCK RCTN Cpblty Eq | $113,138 | -$10,182 | -$20,365 |
Florida | Fort Walton Beach | 2010 | Electric Vehicular Lights and Fixtures | $102,964 | -$9,267 | -$18,534 |
Florida | Fort Walton Beach | 2010 | Electrical & Elct Boards, Cards & Asscted Hrdwre | $2,138,816 | -$192,493 | -$384,987 |
Florida | Fort Walton Beach | 2010 | Electrical & Elct Properties Meas & Tst Instrumnts | $102,291 | -$9,206 | -$18,412 |
Florida | Fort Walton Beach | 2010 | Electrical Control Equipment | $22,050 | -$1,985 | -$3,969 |
Florida | Fort Walton Beach | 2010 | Engine Fuel System Components, Aircraft & Missile | $2,422 | -$218 | -$436 |
Florida | Fort Walton Beach | 2010 | Engineering Technical Services | $51,086,570 | -$4,597,791 | -$9,195,583 |
Florida | Fort Walton Beach | 2010 | Explosive and Pyrotechnic Comps, Nucl Ord | $132,000 | -$11,880 | -$23,760 |
Florida | Fort Walton Beach | 2010 | Fiber Optic Cable Assemblies and Harnesses | $6,076 | -$547 | -$1,094 |
Florida | Fort Walton Beach | 2010 | Fittings and Specialties; Hose, Pipe, Tube | $68,714 | -$6,184 | -$12,369 |
Florida | Fort Walton Beach | 2010 | Floor Coverings | $43,199 | -$3,888 | -$7,776 |
Florida | Fort Walton Beach | 2010 | Guard Services | $562,808 | -$50,653 | -$101,305 |
Florida | Fort Walton Beach | 2010 | Guided Missile Remote Control Systems | $2,762,115 | -$248,590 | -$497,181 |
Florida | Fort Walton Beach | 2010 | Guns, Over 30 MM Up to 75 MM | $201,174 | -$18,106 | -$36,211 |
Florida | Fort Walton Beach | 2010 | Hand Tools, Nonedged, Nonpowered | $1,467 | -$132 | -$264 |
Florida | Fort Walton Beach | 2010 | Hardware, Weapon System | $11,581 | -$1,042 | -$2,085 |
Florida | Fort Walton Beach | 2010 | Hazardous Substance Removal/Cleanup/Disposal SVCS | $7,886 | -$710 | -$1,419 |
Florida | Fort Walton Beach | 2010 | Hose and Tubing, Flexible | $124,117 | -$11,171 | -$22,341 |
Florida | Fort Walton Beach | 2010 | Industrial Size Reduction Machinery | $18,290 | -$1,646 | -$3,292 |
Florida | Fort Walton Beach | 2010 | Inspection Gages & Precision Layout Tools | $15,120 | -$1,361 | -$2,722 |
Florida | Fort Walton Beach | 2010 | Installation of Eq/Electrical & Elct Equip Comps | $878,480 | -$79,063 | -$158,126 |
Florida | Fort Walton Beach | 2010 | Knobs and Pointers | $14,632 | -$1,317 | -$2,634 |
Florida | Fort Walton Beach | 2010 | Launchers, Guided Missile | $851,240 | -$76,612 | -$153,223 |
Florida | Fort Walton Beach | 2010 | Lectures for Training | $9,000 | -$810 | -$1,620 |
Florida | Fort Walton Beach | 2010 | Lodging - Hotel/Motel | $31,018 | -$2,792 | -$5,583 |
Florida | Fort Walton Beach | 2010 | Lumber and Related Basic Wood Materials | $6,099 | -$549 | -$1,098 |
Florida | Fort Walton Beach | 2010 | Machine Tool Accessories | $8,202 | -$738 | -$1,476 |
Florida | Fort Walton Beach | 2010 | Maint & Repair of Eq/ADP Equip & Supplies | $92,013 | -$8,281 | -$16,562 |
Florida | Fort Walton Beach | 2010 | Maint & Repair of Eq/Aircraft Comps & Accys | $2,692,260 | -$242,303 | -$484,607 |
Florida | Fort Walton Beach | 2010 | Maint & Repair of Eq/Construction Materials | $20,000 | -$1,800 | -$3,600 |
Florida | Fort Walton Beach | 2010 | Maint & Repair of Eq/Electrical & Elct Equip Comps | $2,181,858 | -$196,367 | -$392,734 |
Florida | Fort Walton Beach | 2010 | Maint & Repair of Eq/Training Aids & Devices | $83,498 | -$7,515 | -$15,030 |
Florida | Fort Walton Beach | 2010 | Maint & Repair of Eq/Vehicles-Trailers-Cycles | $4,314 | -$388 | -$777 |
Florida | Fort Walton Beach | 2010 | Maint/All Other Non-Building Facilities | $8,721 | -$785 | -$1,570 |
Florida | Fort Walton Beach | 2010 | Maint/Other Miscellaneous Buildings | $114,347 | -$10,291 | -$20,582 |
Florida | Fort Walton Beach | 2010 | Marine Hardware and Hull Items | $5,710 | -$514 | -$1,028 |
Florida | Fort Walton Beach | 2010 | Medical & Surgical Instruments, Equip & Supplies | $8,025 | -$722 | -$1,445 |
Florida | Fort Walton Beach | 2010 | Mineral Construction Materials, Bulk | $249,339 | -$22,441 | -$44,881 |
Florida | Fort Walton Beach | 2010 | Misc Alarm, Signal and Security Detection Systems | $115,911 | -$10,432 | -$20,864 |
Florida | Fort Walton Beach | 2010 | Misc Electric Power & Distribution Eq | $1,644,941 | -$148,045 | -$296,089 |
Florida | Fort Walton Beach | 2010 | Misc Electrical & Electronic Components | $12,248 | -$1,102 | -$2,205 |
Florida | Fort Walton Beach | 2010 | Misc Household & Coml Furnishings & Appliances | $139,409 | -$12,547 | -$25,094 |
Florida | Fort Walton Beach | 2010 | Miscellaneous Communication Equipment | $288,441 | -$25,960 | -$51,919 |
Florida | Fort Walton Beach | 2010 | Miscellaneous Hardware | $520,446 | -$46,840 | -$93,680 |
Florida | Fort Walton Beach | 2010 | Miscellaneous Materials Handling Equip | $59,500 | -$5,355 | -$10,710 |
Florida | Fort Walton Beach | 2010 | Miscellaneous Printed Matter | $314 | -$28 | -$57 |
Florida | Fort Walton Beach | 2010 | Miscellaneous Ship and Marine Equipment | $17,088 | -$1,538 | -$3,076 |
Florida | Fort Walton Beach | 2010 | Miscellaneous Vehicular Components | $7,730 | -$696 | -$1,391 |
Florida | Fort Walton Beach | 2010 | Motors, Electrical | $473 | -$43 | -$85 |
Florida | Fort Walton Beach | 2010 | MSL Aircraft Accessories and Components | $11,832 | -$1,065 | -$2,130 |
Florida | Fort Walton Beach | 2010 | Nails, Keys, And Pins | $11,400 | -$1,026 | -$2,052 |
Florida | Fort Walton Beach | 2010 | Night Vision Equipment, Emitted and Reflect Radia | $391,729 | -$35,256 | -$70,511 |
Florida | Fort Walton Beach | 2010 | Office Furniture | $35,939 | -$3,235 | -$6,469 |
Florida | Fort Walton Beach | 2010 | Operational Training Devices | $130,200 | -$11,718 | -$23,436 |
Florida | Fort Walton Beach | 2010 | Optoelectronic Devices & Assoc Hardware | $333,700 | -$30,033 | -$60,066 |
Florida | Fort Walton Beach | 2010 | Other ADP & Telecommunication Services | $12,335,720 | -$1,110,215 | -$2,220,430 |
Florida | Fort Walton Beach | 2010 | Other Management Support Services | $857,369 | -$77,163 | -$154,326 |
Florida | Fort Walton Beach | 2010 | Other Natural Resources & Conservation Services | $3,364,071 | -$302,766 | -$605,533 |
Florida | Fort Walton Beach | 2010 | Other Photographic Mapping, Printing, & Pub SVCS | $12,237,376 | -$1,101,364 | -$2,202,728 |
Florida | Fort Walton Beach | 2010 | Other Professional Services | $6,183,370 | -$556,503 | -$1,113,007 |
Florida | Fort Walton Beach | 2010 | Packing/Crating Services | $4,795 | -$432 | -$863 |
Florida | Fort Walton Beach | 2010 | Parachutes and Cargo Tie Down Equipment | $66,285 | -$5,966 | -$11,931 |
Florida | Fort Walton Beach | 2010 | Pipe and Tube | $6,325 | -$569 | -$1,139 |
Florida | Fort Walton Beach | 2010 | Prefabricated and Portable Buildings | $24,950 | -$2,246 | -$4,491 |
Florida | Fort Walton Beach | 2010 | Program Management/Support Services | $27,632,625 | -$2,486,936 | -$4,973,873 |
Florida | Fort Walton Beach | 2010 | Programming Services | $46,313,859 | -$4,168,247 | -$8,336,495 |
Florida | Fort Walton Beach | 2010 | Pyrotechnics | $201,000 | -$18,090 | -$36,180 |
Florida | Fort Walton Beach | 2010 | Radar Equipment, Except Airborne | $22,808,133 | -$2,052,732 | -$4,105,464 |
Florida | Fort Walton Beach | 2010 | Radio and TV Comm Equipment, Airborne | $2,266,319 | -$203,969 | -$407,937 |
Florida | Fort Walton Beach | 2010 | RDTE/Aircraft-Demo/Valid | $1,325,000 | -$119,250 | -$238,500 |
Florida | Fort Walton Beach | 2010 | RDTE/Electronics & Communication Eq-Applied Resea | $6,743,356 | -$606,902 | -$1,213,804 |
Florida | Fort Walton Beach | 2010 | RDTE/Electronics & Communication Eq-Demo/Valid | $160,000 | -$14,400 | -$28,800 |
Florida | Fort Walton Beach | 2010 | RDTE/Electronics & Communication Eq-Eng/Manuf Dev | $651,553 | -$58,640 | -$117,280 |
Florida | Fort Walton Beach | 2010 | RDTE/Electronics & Communication Eq-Op System Dev | $4,978,513 | -$448,066 | -$896,132 |
Florida | Fort Walton Beach | 2010 | RDTE/Environmental Sciences - Adv Tech Dev | $1,029,458 | -$92,651 | -$185,302 |
Florida | Fort Walton Beach | 2010 | RDTE/Missile and Space Systems-Adv Tech Dev | $262,500 | -$23,625 | -$47,250 |
Florida | Fort Walton Beach | 2010 | RDTE/Other Defense-Management Support | $4,526,233 | -$407,361 | -$814,722 |
Florida | Fort Walton Beach | 2010 | RDTE/Other Research & Development-Adv Tech Dev | $99,904 | -$8,991 | -$17,983 |
Florida | Fort Walton Beach | 2010 | RDTE/Other Research & Development-Mgmt Support | $773,664 | -$69,630 | -$139,260 |
Florida | Fort Walton Beach | 2010 | RDTE/Services-Basic Research | $1,910,582 | -$171,952 | -$343,905 |
Florida | Fort Walton Beach | 2010 | RDTE/Services-Demo/Valid | $14,090,704 | -$1,268,163 | -$2,536,327 |
Florida | Fort Walton Beach | 2010 | RDTE/Weapons-Applied Research | $532,920 | -$47,963 | -$95,926 |
Florida | Fort Walton Beach | 2010 | RDTE/Weapons-Basic Research | $100,985 | -$9,089 | -$18,177 |
Florida | Fort Walton Beach | 2010 | RDTE/Weapons-Management Support | $873,098 | -$78,579 | -$157,158 |
Florida | Fort Walton Beach | 2010 | Resistors | $15,485 | -$1,394 | -$2,787 |
Florida | Fort Walton Beach | 2010 | Restoration Activities | $20,059 | -$1,805 | -$3,611 |
Florida | Fort Walton Beach | 2010 | Rings, Shims, And Spacers | $4,285 | -$386 | -$771 |
Florida | Fort Walton Beach | 2010 | Sets, Kits, And Outfits of Hand Tools | $2,385,086 | -$214,658 | -$429,315 |
Florida | Fort Walton Beach | 2010 | Signs, Advertizing Displays, And Ident Plates | $7,142 | -$643 | -$1,286 |
Florida | Fort Walton Beach | 2010 | Switches | $344,222 | -$30,980 | -$61,960 |
Florida | Fort Walton Beach | 2010 | Systems Engineering Services | $49,178,844 | -$4,426,096 | -$8,852,192 |
Florida | Fort Walton Beach | 2010 | Tech Rep SVCS/Weapons | $169,118 | -$15,221 | -$30,441 |
Florida | Fort Walton Beach | 2010 | Tents and Tarpaulins | $166,881 | -$15,019 | -$30,039 |
Florida | Fort Walton Beach | 2010 | Training Aids | $306,230 | -$27,561 | -$55,121 |
Florida | Fort Walton Beach | 2010 | Transformers: Distribution & Power Station | $135,149 | -$12,163 | -$24,327 |
Florida | Fort Walton Beach | 2010 | Vehicular Cab, Body, Frame Structural Comp | $14,160 | -$1,274 | -$2,549 |
Florida | Fort Walton Beach | 2010 | Waste Treatment & Storage | $95,000 | -$8,550 | -$17,100 | TOTAL | $310,151,386 | -$27,913,627 | -$55,827,253 |
All Reports | Return to Place of Performance | Return to State Index | FAQ Page | USA Summary Reports |
Created by the Center for Security Policy Defense Breakdown Economic Impact Report Generator (v.2.2.0-PoP) February 20, 2012 01:07:13 www.forthecommondefense.org