All Reports | Return to Place of Performance | Return to State Index | FAQ Page | USA Summary Reports |
Go to www.forthecommondefense.org/reports to view detailed reports on Texas counties, cities, Congressional Districts, industries, small businesses and information on sources and methodology.
State | City | Contract Year | Product or Service | $ Amount | Reduction by 9.0% | Reduction by 18.0% |
Texas | Arlington | 2010 | ACFT Hydraulic, Vacuum & DE-Icing Sys Comp | $56,073 | -$5,047 | -$10,093 |
Texas | Arlington | 2010 | ACFT Maint & Repair Shop Specilized Equip | $117,980 | -$10,618 | -$21,236 |
Texas | Arlington | 2010 | ADP Components | $14,310 | -$1,288 | -$2,576 |
Texas | Arlington | 2010 | ADP Input/Output and Storage Devices | $43,914 | -$3,952 | -$7,905 |
Texas | Arlington | 2010 | ADP Software | $56,880 | -$5,119 | -$10,238 |
Texas | Arlington | 2010 | ADP Software, Equipment, And Tele Training | $6,800 | -$612 | -$1,224 |
Texas | Arlington | 2010 | ADP Support Equip | $22,545 | -$2,029 | -$4,058 |
Texas | Arlington | 2010 | ADP Telecommunications & Transmission Services | $76,012 | -$6,841 | -$13,682 |
Texas | Arlington | 2010 | ADPE System Configuration | $14,564 | -$1,311 | -$2,622 |
Texas | Arlington | 2010 | Aircraft Fixed Wing | $45,944,521 | -$4,135,007 | -$8,270,014 |
Texas | Arlington | 2010 | Aircraft Ground Servicing Equipment | $210,444 | -$18,940 | -$37,880 |
Texas | Arlington | 2010 | Aircraft Launching Equipment | $19,979 | -$1,798 | -$3,596 |
Texas | Arlington | 2010 | Airframe Structural Components | $1,127,772 | -$101,499 | -$202,999 |
Texas | Arlington | 2010 | Antennas, Waveguides & Related Equipment | $65,444 | -$5,890 | -$11,780 |
Texas | Arlington | 2010 | Bearings, Plain, Unmounted | $5,645 | -$508 | -$1,016 |
Texas | Arlington | 2010 | Belting, Drive Belts, Fan Belts & Accys | $34,000 | -$3,060 | -$6,120 |
Texas | Arlington | 2010 | Bolts | $945,553 | -$85,100 | -$170,200 |
Texas | Arlington | 2010 | Bridges, Fixed and Floating | $5,350 | -$482 | -$963 |
Texas | Arlington | 2010 | Cable, Cord, Wire Assemblies: Comm Equip | $159,479 | -$14,353 | -$28,706 |
Texas | Arlington | 2010 | Centrifugals, Separators, And Press and Vac Filt | $206,453 | -$18,581 | -$37,162 |
Texas | Arlington | 2010 | Chemicals | $53,663 | -$4,830 | -$9,659 |
Texas | Arlington | 2010 | Communication Training Devices | $10,046,401 | -$904,176 | -$1,808,352 |
Texas | Arlington | 2010 | Connectors, Electrical | $101,950 | -$9,176 | -$18,351 |
Texas | Arlington | 2010 | Demolition Materials | $4,125 | -$371 | -$743 |
Texas | Arlington | 2010 | Elec Insulators and Insulating Material | $12,510 | -$1,126 | -$2,252 |
Texas | Arlington | 2010 | Electric Lamps | $90,173 | -$8,116 | -$16,231 |
Texas | Arlington | 2010 | Electric Portable & Hand Lighting Equip | $46,793 | -$4,211 | -$8,423 |
Texas | Arlington | 2010 | Electric Vehicular Lights and Fixtures | $190,289 | -$17,126 | -$34,252 |
Texas | Arlington | 2010 | Electrical & Elct Boards, Cards & Asscted Hrdwre | $24,031 | -$2,163 | -$4,326 |
Texas | Arlington | 2010 | Electrical & Elct Properties Meas & Tst Instrumnts | $3,067 | -$276 | -$552 |
Texas | Arlington | 2010 | Electrical & Ultrasonic Erosion Machines | $14,047 | -$1,264 | -$2,528 |
Texas | Arlington | 2010 | Electrical Control Equipment | $4,934 | -$444 | -$888 |
Texas | Arlington | 2010 | Electrical Hardware and Supplies | $49,478 | -$4,453 | -$8,906 |
Texas | Arlington | 2010 | Engine Electrical Sys Comps, Nonaircraft | $7,000 | -$630 | -$1,260 |
Texas | Arlington | 2010 | Engineering Technical Services | $164,509 | -$14,806 | -$29,612 |
Texas | Arlington | 2010 | Equip & Mats Testing/Ores & Minerals | $7,524 | -$677 | -$1,354 |
Texas | Arlington | 2010 | Fastening Devices | $1,055,624 | -$95,006 | -$190,012 |
Texas | Arlington | 2010 | Filters and Networks | $21,819 | -$1,964 | -$3,927 |
Texas | Arlington | 2010 | Fittings and Specialties; Hose, Pipe, Tube | $755,803 | -$68,022 | -$136,045 |
Texas | Arlington | 2010 | Flags and Pennants | $165 | -$15 | -$30 |
Texas | Arlington | 2010 | Flight Instruments | $6,036 | -$543 | -$1,086 |
Texas | Arlington | 2010 | Floor Polishers and Vacuum Cleaners Equipment | $87,005 | -$7,830 | -$15,661 |
Texas | Arlington | 2010 | Food Services | $14,799 | -$1,332 | -$2,664 |
Texas | Arlington | 2010 | Footwear, Men's | $26,068 | -$2,346 | -$4,692 |
Texas | Arlington | 2010 | Fuel Burning Equipment Units | $9,994 | -$899 | -$1,799 |
Texas | Arlington | 2010 | Fuel Supply Facilities | $498,700 | -$44,883 | -$89,766 |
Texas | Arlington | 2010 | Gas Generating and Dispensing Systems | $38,468 | -$3,462 | -$6,924 |
Texas | Arlington | 2010 | Gas Reciprocating Eng, Excl ACFT, & Components | $3,326 | -$299 | -$599 |
Texas | Arlington | 2010 | Gas Turbines and Jet Engines, ACFT & Comps | $194,680 | -$17,521 | -$35,042 |
Texas | Arlington | 2010 | Gears, Pulleys, Sprockets and Trans Chain | $14,708 | -$1,324 | -$2,647 |
Texas | Arlington | 2010 | Guided Missile Handling & Servicing Equip | $27,264 | -$2,454 | -$4,908 |
Texas | Arlington | 2010 | Guided Missile Remote Control Systems | $3,127 | -$281 | -$563 |
Texas | Arlington | 2010 | Guns, Over 150 MM Through 200 MM | $11,110 | -$1,000 | -$2,000 |
Texas | Arlington | 2010 | Guns, Through 30 MM | $117,378 | -$10,564 | -$21,128 |
Texas | Arlington | 2010 | Hand Tools, Nonedged, Nonpowered | $7,093 | -$638 | -$1,277 |
Texas | Arlington | 2010 | Hand Tools, Power Driven | $71,670 | -$6,450 | -$12,901 |
Texas | Arlington | 2010 | Hardware, Weapon System | $1,145,578 | -$103,102 | -$206,204 |
Texas | Arlington | 2010 | Helicopter Rotor Blades, Drive Mechanisms & Compon | $144,543 | -$13,009 | -$26,018 |
Texas | Arlington | 2010 | Hose and Tubing, Flexible | $4,770 | -$429 | -$859 |
Texas | Arlington | 2010 | Hospital Furniture, Equip, Utensils, & Sup | $18,000 | -$1,620 | -$3,240 |
Texas | Arlington | 2010 | Household Furniture | $16,376 | -$1,474 | -$2,948 |
Texas | Arlington | 2010 | Industrial Marking Machines | $14,175 | -$1,276 | -$2,552 |
Texas | Arlington | 2010 | Installation of Eq/Communication Equipment | $28,661 | -$2,579 | -$5,159 |
Texas | Arlington | 2010 | Laboratory Equipment & Supplies | $79,750 | -$7,178 | -$14,355 |
Texas | Arlington | 2010 | Launchers, Guided Missile | $44,031 | -$3,963 | -$7,926 |
Texas | Arlington | 2010 | Launchers, Torpedo and Depth Charge | $37,893 | -$3,410 | -$6,821 |
Texas | Arlington | 2010 | Lodging - Hotel/Motel | $171,834 | -$15,465 | -$30,930 |
Texas | Arlington | 2010 | Logistics Support Services | $378,864 | -$34,098 | -$68,196 |
Texas | Arlington | 2010 | Lubrication & Fuel Dispensing Equipment | $7,136 | -$642 | -$1,284 |
Texas | Arlington | 2010 | Lugs, Terminals, And Terminal Strips | $53,885 | -$4,850 | -$9,699 |
Texas | Arlington | 2010 | Machine Tool Accessories | $12,508 | -$1,126 | -$2,251 |
Texas | Arlington | 2010 | Maint & Repair of Eq/Aircraft Structural Comps | $38,321,098 | -$3,448,899 | -$6,897,798 |
Texas | Arlington | 2010 | Maint & Repair of Eq/Training Aids & Devices | $72,703,950 | -$6,543,356 | -$13,086,712 |
Texas | Arlington | 2010 | Maint/All Other Non-Building Facilities | $16,560 | -$1,490 | -$2,981 |
Texas | Arlington | 2010 | Medical & Surgical Instruments, Equip & Supplies | $27,478 | -$2,473 | -$4,946 |
Texas | Arlington | 2010 | Milling Machines | $6,329 | -$570 | -$1,139 |
Texas | Arlington | 2010 | Misc Electric Power & Distribution Eq | $411,763 | -$37,059 | -$74,117 |
Texas | Arlington | 2010 | Misc Electrical & Electronic Components | $7,550 | -$680 | -$1,359 |
Texas | Arlington | 2010 | Miscellaneous Communication Equipment | $20,781 | -$1,870 | -$3,741 |
Texas | Arlington | 2010 | Miscellaneous Construction Materials | $2,105 | -$189 | -$379 |
Texas | Arlington | 2010 | Miscellaneous Fire Control Equipment | $25,503 | -$2,295 | -$4,591 |
Texas | Arlington | 2010 | Miscellaneous Hardware | $220,385 | -$19,835 | -$39,669 |
Texas | Arlington | 2010 | Miscellaneous Maint & Repair Shop Specilized Eq | $37,586 | -$3,383 | -$6,765 |
Texas | Arlington | 2010 | Miscellaneous Office Machines | $9,795 | -$882 | -$1,763 |
Texas | Arlington | 2010 | Miscellaneous Power Transmission Equip | $356,700 | -$32,103 | -$64,206 |
Texas | Arlington | 2010 | Miscellaneous Vehicular Components | $33,330 | -$3,000 | -$5,999 |
Texas | Arlington | 2010 | Miscellaneous Weapons | $13,261 | -$1,193 | -$2,387 |
Texas | Arlington | 2010 | Modification of Eq/Training Aids & Devices | $38,631,326 | -$3,476,819 | -$6,953,639 |
Texas | Arlington | 2010 | Motor Passenger Service | $9,849 | -$886 | -$1,773 |
Texas | Arlington | 2010 | MSL Aircraft Accessories and Components | $18,185,578 | -$1,636,702 | -$3,273,404 |
Texas | Arlington | 2010 | Nails, Keys, And Pins | $7,414 | -$667 | -$1,335 |
Texas | Arlington | 2010 | Night Vision Equipment, Emitted and Reflect Radia | $11,212 | -$1,009 | -$2,018 |
Texas | Arlington | 2010 | Non-Government Insurance Programs | $17,568 | -$1,581 | -$3,162 |
Texas | Arlington | 2010 | Nuts and Washers | $2,487,685 | -$223,892 | -$447,783 |
Texas | Arlington | 2010 | Office Buildings | $7,331 | -$660 | -$1,320 |
Texas | Arlington | 2010 | Operational Training Devices | $35,235,025 | -$3,171,152 | -$6,342,305 |
Texas | Arlington | 2010 | Optical Instruments, Test Equip, Comps & Accys | $24,676 | -$2,221 | -$4,442 |
Texas | Arlington | 2010 | Other Airfield Structures | $51,539 | -$4,639 | -$9,277 |
Texas | Arlington | 2010 | Other Special Studies & Analyses | $103,687 | -$9,332 | -$18,664 |
Texas | Arlington | 2010 | Outerwear, Men's | $4,469 | -$402 | -$804 |
Texas | Arlington | 2010 | Packing and Gasket Materials | $290,007 | -$26,101 | -$52,201 |
Texas | Arlington | 2010 | Packing/Crating Services | $1,406 | -$127 | -$253 |
Texas | Arlington | 2010 | Paints, Dopes, Varnishes, & Related Product | $10,992 | -$989 | -$1,979 |
Texas | Arlington | 2010 | Paper and Paperboard | $262,385 | -$23,615 | -$47,229 |
Texas | Arlington | 2010 | Parachutes and Cargo Tie Down Equipment | $4,047 | -$364 | -$728 |
Texas | Arlington | 2010 | Passenger Motor Charter Service | $5,750 | -$518 | -$1,035 |
Texas | Arlington | 2010 | Pipe and Tube | $30,844 | -$2,776 | -$5,552 |
Texas | Arlington | 2010 | Plate, Sheet, Strip, Foil; Iron and Steel | $17,029 | -$1,533 | -$3,065 |
Texas | Arlington | 2010 | Power and Hand Pumps | $34,848 | -$3,136 | -$6,273 |
Texas | Arlington | 2010 | Prefabricated and Portable Buildings | $4,415 | -$397 | -$795 |
Texas | Arlington | 2010 | Radio & TV Comm Equipment, Except Airborne | $399,726 | -$35,975 | -$71,951 |
Texas | Arlington | 2010 | Radio Navigation Equip, Except Airborne | $20,440 | -$1,840 | -$3,679 |
Texas | Arlington | 2010 | Radio Navigation Equipment, Airborne | $9,945 | -$895 | -$1,790 |
Texas | Arlington | 2010 | RDTE/Aircraft-Eng/Manuf Develop | $13,465,752 | -$1,211,918 | -$2,423,835 |
Texas | Arlington | 2010 | RDTE/Electronics & Communication Eq-Applied Resea | $375,000 | -$33,750 | -$67,500 |
Texas | Arlington | 2010 | RDTE/Electronics & Communication Eq-Basic Research | $29,984 | -$2,699 | -$5,397 |
Texas | Arlington | 2010 | RDTE/Missile and Space Systems-Basic Research | $200,000 | -$18,000 | -$36,000 |
Texas | Arlington | 2010 | RDTE/Other Defense-Adv Tech Dev | $28,662,554 | -$2,579,630 | -$5,159,260 |
Texas | Arlington | 2010 | RDTE/Other Defense-Applied Research | $39,910 | -$3,592 | -$7,184 |
Texas | Arlington | 2010 | RDTE/Other Defense-Eng/Manuf Develop | $19,511 | -$1,756 | -$3,512 |
Texas | Arlington | 2010 | RDTE/Other Research & Development-Applied Researc | $1,162,999 | -$104,670 | -$209,340 |
Texas | Arlington | 2010 | RDTE/Other Research & Development-Basic Research | $5,551,916 | -$499,672 | -$999,345 |
Texas | Arlington | 2010 | Resistors | $80,251 | -$7,223 | -$14,445 |
Texas | Arlington | 2010 | Rings, Shims, And Spacers | $37,055 | -$3,335 | -$6,670 |
Texas | Arlington | 2010 | Rivets | $281,477 | -$25,333 | -$50,666 |
Texas | Arlington | 2010 | Scales and Balances | $372,079 | -$33,487 | -$66,974 |
Texas | Arlington | 2010 | Screws | $347,038 | -$31,233 | -$62,467 |
Texas | Arlington | 2010 | Semiconductor Devices & Assoc Hardware | $4,209 | -$379 | -$758 |
Texas | Arlington | 2010 | Signs, Advertizing Displays, And Ident Plates | $4,204 | -$378 | -$757 |
Texas | Arlington | 2010 | Studs | $17,928 | -$1,614 | -$3,227 |
Texas | Arlington | 2010 | Switches | $4,316 | -$388 | -$777 |
Texas | Arlington | 2010 | Tech Rep SVCS/ADP Equip & Supplies | $31,620 | -$2,846 | -$5,692 |
Texas | Arlington | 2010 | Telecommunication Network Management Services | $49,218 | -$4,430 | -$8,859 |
Texas | Arlington | 2010 | Torque Converters and Speed Changers | $359,279 | -$32,335 | -$64,670 |
Texas | Arlington | 2010 | Training Aids | $97,127,709 | -$8,741,494 | -$17,482,988 |
Texas | Arlington | 2010 | Tuition, Registration & Membership Fees | $88,726 | -$7,985 | -$15,971 |
Texas | Arlington | 2010 | Valves, Nonpowered | $100,165 | -$9,015 | -$18,030 |
Texas | Arlington | 2010 | Vehicular Brake, Steering, Axle Wheel Comp | $50,031 | -$4,503 | -$9,006 |
Texas | Arlington | 2010 | Vehicular Cab, Body, Frame Structural Comp | $8,453 | -$761 | -$1,522 |
Texas | Arlington | 2010 | Vehicular Furniture and Accessories | $43,054 | -$3,875 | -$7,750 |
Texas | Arlington | 2010 | Vocational/Technical | $496,246 | -$44,662 | -$89,324 |
Texas | Arlington | 2010 | Water Quality Studies | $2,665 | -$240 | -$480 | TOTAL | $422,173,769 | -$37,995,642 | -$75,991,286 |
All Reports | Return to Place of Performance | Return to State Index | FAQ Page | USA Summary Reports |
Created by the Center for Security Policy Defense Breakdown Economic Impact Report Generator (v.2.2.0-PoP) February 20, 2012 13:27:48 www.forthecommondefense.org