Go to www.forthecommondefense.org/reports to view detailed reports on Texas counties, cities, Congressional Districts, industries, small businesses and information on sources and methodology.
BACKGROUND ON THE DEFENSE BUDGET CUTS: 2013-2021
|
State | City | Contract Year | Product or Service | $ Amount | Reduction by 9.0% | Reduction by 18.0% |
Texas | Arlington | 2012 | ACFT Hydraulic, Vacuum & DE-Icing Sys Comp | $64,016 | -$5,761 | -$11,523 |
Texas | Arlington | 2012 | ACFT Maint & Repair Shop Specilized Equip | $830,964 | -$74,787 | -$149,574 |
Texas | Arlington | 2012 | ADP Components | $261,076 | -$23,497 | -$46,994 |
Texas | Arlington | 2012 | ADP Software | $17,271 | -$1,554 | -$3,109 |
Texas | Arlington | 2012 | ADP Supplies | $7,500 | -$675 | -$1,350 |
Texas | Arlington | 2012 | ADP Support Equip | $12,828 | -$1,155 | -$2,309 |
Texas | Arlington | 2012 | Advertising Services | $35,000 | -$3,150 | -$6,300 |
Texas | Arlington | 2012 | Aircraft AC, Heating, And Pressurizing Equipment | $39,783 | -$3,580 | -$7,161 |
Texas | Arlington | 2012 | Aircraft Fixed Wing | $23,994,251 | -$2,159,483 | -$4,318,965 |
Texas | Arlington | 2012 | Aircraft Ground Servicing Equipment | $41,446 | -$3,730 | -$7,460 |
Texas | Arlington | 2012 | Airframe Structural Components | $599,471 | -$53,952 | -$107,905 |
Texas | Arlington | 2012 | Bearings, Plain, Unmounted | $41,982 | -$3,778 | -$7,557 |
Texas | Arlington | 2012 | Belting, Drive Belts, Fan Belts & Accys | $212,580 | -$19,132 | -$38,264 |
Texas | Arlington | 2012 | Bolts | $1,200,842 | -$108,076 | -$216,152 |
Texas | Arlington | 2012 | Cable, Cord, Wire Assemblies: Comm Equip | $361,298 | -$32,517 | -$65,034 |
Texas | Arlington | 2012 | Centrifugals, Separators, And Press and Vac Filt | $314,163 | -$28,275 | -$56,549 |
Texas | Arlington | 2012 | Chain and Wire Rope | $3,249 | -$292 | -$585 |
Texas | Arlington | 2012 | Chemicals | $106,920 | -$9,623 | -$19,246 |
Texas | Arlington | 2012 | Coil, Flat, And Wire Springs | $1,437 | -$129 | -$259 |
Texas | Arlington | 2012 | Compressors and Vacuum Pumps | $5,314 | -$478 | -$957 |
Texas | Arlington | 2012 | Custodial - Janitorial Services | $6,675 | -$601 | -$1,202 |
Texas | Arlington | 2012 | Demolition Materials | $6,716 | -$604 | -$1,209 |
Texas | Arlington | 2012 | Electric Portable & Hand Lighting Equip | $18,089 | -$1,628 | -$3,256 |
Texas | Arlington | 2012 | Electric Vehicular Lights and Fixtures | $58,543 | -$5,269 | -$10,538 |
Texas | Arlington | 2012 | Electrical & Elct Properties Meas & Tst Instrumnts | $104,400 | -$9,396 | -$18,792 |
Texas | Arlington | 2012 | Electrical Control Equipment | $324,400 | -$29,196 | -$58,392 |
Texas | Arlington | 2012 | Electrical Hardware and Supplies | $107,254 | -$9,653 | -$19,306 |
Texas | Arlington | 2012 | Engine Fuel System Components, Aircraft & Missile | $5,968 | -$537 | -$1,074 |
Texas | Arlington | 2012 | Fastening Devices | $432,922 | -$38,963 | -$77,926 |
Texas | Arlington | 2012 | Filters and Networks | $6,917 | -$623 | -$1,245 |
Texas | Arlington | 2012 | Fittings and Specialties; Hose, Pipe, Tube | $1,315,750 | -$118,418 | -$236,835 |
Texas | Arlington | 2012 | Flight Instruments | $19,059 | -$1,715 | -$3,431 |
Texas | Arlington | 2012 | Floor Coverings | $47,333 | -$4,260 | -$8,520 |
Texas | Arlington | 2012 | Footwear, Men's | $23,819 | -$2,144 | -$4,287 |
Texas | Arlington | 2012 | Fuel Burning Equipment Units | $36,908 | -$3,322 | -$6,643 |
Texas | Arlington | 2012 | Gas Reciprocating Eng, Excl ACFT, & Components | $17,468 | -$1,572 | -$3,144 |
Texas | Arlington | 2012 | Gas Turbines and Jet Eng, Non ACFT; And Comps | $11,808 | -$1,063 | -$2,125 |
Texas | Arlington | 2012 | Gas Turbines and Jet Engines, ACFT & Comps | $173,357 | -$15,602 | -$31,204 |
Texas | Arlington | 2012 | Guns, 75 MM Through 125 MM | $5,600 | -$504 | -$1,008 |
Texas | Arlington | 2012 | Guns, Through 30 MM | $360,811 | -$32,473 | -$64,946 |
Texas | Arlington | 2012 | Hand Tools, Nonedged, Nonpowered | $58,126 | -$5,231 | -$10,463 |
Texas | Arlington | 2012 | Hand Tools, Power Driven | $41,614 | -$3,745 | -$7,491 |
Texas | Arlington | 2012 | Hardware, Weapon System | $1,351,040 | -$121,594 | -$243,187 |
Texas | Arlington | 2012 | Heat Exchangers and Steam Condensers | $4,170 | -$375 | -$751 |
Texas | Arlington | 2012 | Helicopter Rotor Blades, Drive Mechanisms & Compon | $114,609 | -$10,315 | -$20,630 |
Texas | Arlington | 2012 | Hose and Tubing, Flexible | $425,652 | -$38,309 | -$76,617 |
Texas | Arlington | 2012 | Individual Equipment | $867 | -$78 | -$156 |
Texas | Arlington | 2012 | Indoor & Outdoor Electric Lighting Fixtures | $78,696 | -$7,083 | -$14,165 |
Texas | Arlington | 2012 | Industrial Marking Machines | $4,285 | -$386 | -$771 |
Texas | Arlington | 2012 | Intercomm & Public Address Sys, Airborne | $34,208 | -$3,079 | -$6,157 |
Texas | Arlington | 2012 | Laboratory Equipment & Supplies | $35,650 | -$3,209 | -$6,417 |
Texas | Arlington | 2012 | Launchers, Guided Missile | $4,254 | -$383 | -$766 |
Texas | Arlington | 2012 | Launchers, Torpedo and Depth Charge | $17,535 | -$1,578 | -$3,156 |
Texas | Arlington | 2012 | Locomotive & Rail Car Accessories & Comps | $4,398 | -$396 | -$792 |
Texas | Arlington | 2012 | Lodging - Hotel/Motel | $24,378 | -$2,194 | -$4,388 |
Texas | Arlington | 2012 | Lugs, Terminals, And Terminal Strips | $52,126 | -$4,691 | -$9,383 |
Texas | Arlington | 2012 | Machine Tools, Portable | $3,995 | -$360 | -$719 |
Texas | Arlington | 2012 | Maint & Repair of Eq/Aircraft Comps & Accys | $11,495,482 | -$1,034,593 | -$2,069,187 |
Texas | Arlington | 2012 | Maint & Repair of Eq/Aircraft Structural Comps | $14,869,972 | -$1,338,298 | -$2,676,595 |
Texas | Arlington | 2012 | Maint & Repair of Eq/Guided Missiles | $655,335 | -$58,980 | -$117,960 |
Texas | Arlington | 2012 | Maint & Repair of Eq/Training Aids & Devices | $20,126,682 | -$1,811,401 | -$3,622,803 |
Texas | Arlington | 2012 | Maint & Repair of Eq/Valves | $25,350 | -$2,282 | -$4,563 |
Texas | Arlington | 2012 | Medical & Surgical Instruments, Equip & Supplies | $4,932 | -$444 | -$888 |
Texas | Arlington | 2012 | Milling Machines | $20,300 | -$1,827 | -$3,654 |
Texas | Arlington | 2012 | Misc Alarm, Signal and Security Detection Systems | $204,861 | -$18,437 | -$36,875 |
Texas | Arlington | 2012 | Misc Electric Power & Distribution Eq | $675,288 | -$60,776 | -$121,552 |
Texas | Arlington | 2012 | Misc Electrical & Electronic Components | $8,258 | -$743 | -$1,486 |
Texas | Arlington | 2012 | Miscellaneous Construction Materials | $7,719 | -$695 | -$1,389 |
Texas | Arlington | 2012 | Miscellaneous Engine Accessories, Aircraft | $12,260 | -$1,103 | -$2,207 |
Texas | Arlington | 2012 | Miscellaneous Hardware | $336,456 | -$30,281 | -$60,562 |
Texas | Arlington | 2012 | Miscellaneous Power Transmission Equip | $319,280 | -$28,735 | -$57,470 |
Texas | Arlington | 2012 | Miscellaneous Vehicular Components | $30,560 | -$2,750 | -$5,501 |
Texas | Arlington | 2012 | Miscellaneous Waxes, Oils, And Fats | $5,181 | -$466 | -$933 |
Texas | Arlington | 2012 | Modification of Eq/Training Aids & Devices | $4,261,071 | -$383,496 | -$766,993 |
Texas | Arlington | 2012 | Nails, Keys, And Pins | $24,789 | -$2,231 | -$4,462 |
Texas | Arlington | 2012 | Night Vision Equipment, Emitted and Reflect Radia | $5,357 | -$482 | -$964 |
Texas | Arlington | 2012 | Non-Government Insurance Programs | $2,385 | -$215 | -$429 |
Texas | Arlington | 2012 | Nuts and Washers | $1,101,050 | -$99,095 | -$198,189 |
Texas | Arlington | 2012 | Oils & Greases: Cutting, Lubr, & Hydraulic | $5,970 | -$537 | -$1,075 |
Texas | Arlington | 2012 | Operational Training Devices | $119,428,101 | -$10,748,530 | -$21,497,059 |
Texas | Arlington | 2012 | Optical Instruments, Test Equip, Comps & Accys | $15,321 | -$1,379 | -$2,758 |
Texas | Arlington | 2012 | Optical Sighting and Ranging Equipment | $86,053 | -$7,745 | -$15,490 |
Texas | Arlington | 2012 | Other Education & Training Services | $2,326,461 | -$209,381 | -$418,763 |
Texas | Arlington | 2012 | Other Special Studies & Analyses | $107,437 | -$9,669 | -$19,339 |
Texas | Arlington | 2012 | Packing and Gasket Materials | $539,566 | -$48,561 | -$97,122 |
Texas | Arlington | 2012 | Phonographs, Radio and TV Sets: Home Type | $35,086 | -$3,158 | -$6,315 |
Texas | Arlington | 2012 | Photographic Equipment and Accessories | $20,635 | -$1,857 | -$3,714 |
Texas | Arlington | 2012 | Photographic Projection Equipment | $33,646 | -$3,028 | -$6,056 |
Texas | Arlington | 2012 | Pipe and Tube | $34,430 | -$3,099 | -$6,197 |
Texas | Arlington | 2012 | Power and Hand Pumps | $41,979 | -$3,778 | -$7,556 |
Texas | Arlington | 2012 | Prefabricated and Portable Buildings | $52,503 | -$4,725 | -$9,451 |
Texas | Arlington | 2012 | RDTE/Aircraft-Applied Research | $585,000 | -$52,650 | -$105,300 |
Texas | Arlington | 2012 | RDTE/Aircraft-Eng/Manuf Develop | $3,268,127 | -$294,131 | -$588,263 |
Texas | Arlington | 2012 | RDTE/Other Defense-Adv Tech Dev | $3,337,608 | -$300,385 | -$600,769 |
Texas | Arlington | 2012 | RDTE/Other Defense-Basic Research | $47,790 | -$4,301 | -$8,602 |
Texas | Arlington | 2012 | RDTE/Other Research & Development-Basic Research | $209,050 | -$18,815 | -$37,629 |
Texas | Arlington | 2012 | RDTE/Other Research & Development-Mgmt Support | $395,240 | -$35,572 | -$71,143 |
Texas | Arlington | 2012 | Rings, Shims, And Spacers | $53,311 | -$4,798 | -$9,596 |
Texas | Arlington | 2012 | Rivets | $349,119 | -$31,421 | -$62,841 |
Texas | Arlington | 2012 | Rubber Fabricated Materials | $6,976 | -$628 | -$1,256 |
Texas | Arlington | 2012 | Scales and Balances | $793,646 | -$71,428 | -$142,856 |
Texas | Arlington | 2012 | Screws | $333,703 | -$30,033 | -$60,067 |
Texas | Arlington | 2012 | Semiconductor Devices & Assoc Hardware | $6,199 | -$558 | -$1,116 |
Texas | Arlington | 2012 | Sets, Kits, And Outfits of Measuring Tools | $4,898 | -$441 | -$882 |
Texas | Arlington | 2012 | Sets, Kits, Outfits, & Modules, Food Prep & Servng | $13,266 | -$1,194 | -$2,388 |
Texas | Arlington | 2012 | Specialized Shipping & Storage Containers | $13,298 | -$1,197 | -$2,394 |
Texas | Arlington | 2012 | Structural Shapes, Nonferrous Base Metal | $2,134 | -$192 | -$384 |
Texas | Arlington | 2012 | Studs | $19,500 | -$1,755 | -$3,510 |
Texas | Arlington | 2012 | Switches | $3,940 | -$355 | -$709 |
Texas | Arlington | 2012 | Telecommunication Network Management Services | $40,859 | -$3,677 | -$7,355 |
Texas | Arlington | 2012 | Telephone and Telegraph Equipment | $3,884 | -$350 | -$699 |
Texas | Arlington | 2012 | Torque Converters and Speed Changers | $314,963 | -$28,347 | -$56,693 |
Texas | Arlington | 2012 | Training Aids | $88,998,916 | -$8,009,903 | -$16,019,806 |
Texas | Arlington | 2012 | Valves, Nonpowered | $48,230 | -$4,341 | -$8,681 |
Texas | Arlington | 2012 | Valves, Powered | $37,400 | -$3,366 | -$6,732 |
Texas | Arlington | 2012 | Vehicular Furniture and Accessories | $6,787 | -$611 | -$1,222 |
Texas | Arlington | 2012 | Vehicular Power Transmission Components | $6,656 | -$599 | -$1,198 |
Texas | Arlington | 2012 | Visible & Invisible Light Comm Equipment | $15,301 | -$1,377 | -$2,754 |
Texas | Arlington | 2012 | Weapons Maint & Repair Shop Spec Eq | $82,903,903 | -$7,461,352 | -$14,922,703 |
Texas | Arlington | 2012 | Winches, Hoists, Cranes, And Derricks | $3,765 | -$339 | -$678 |
Texas | Arlington | 2012 | Wire and Cable, Electrical | $35,848 | -$3,226 | -$6,453 |
Texas | Arlington | 2012 | Wrapping and Packaging Machinery | $47,002 | -$4,230 | -$8,460 | TOTAL | $392,316,866 | -$35,308,522 | -$70,617,041 |
Data sources and more data available at www.governmentcontractswon.com, compiled from public data at www.fpds.gov
Created by the Center for Security Policy
Defense Breakdown Economic Impact Report Generator (v.2.8.0-PoP) November 6, 2013 19:23:46 www.forthecommondefense.org