For the Common Defense


FY 2012 Detailed ReportsFY 2012 Summary ReportsResources
All 50 States Detailed ReportsAll 50 States Summary ReportsAll Congressional District Spreadsheet Reports
Connecticut Contractor Location Data ReportsUSA Overview Summary ReportGovernment Contracting Office Glossary
Connecticut Place of Performance Data ReportsConnecticut Summary ReportFAQ
  Sequestration Whitepaper
  FY 2011 Reports Archive
  FY 2010 Reports Archive

Connecticut

Defense Breakdown Economic Impact Report
By Place of Performance Data -- Sorted by Product or Service

(FY 2012 Defense Contracts Baseline Data)

Estimated 9% to 18% Annual Budget Reductions Starting in FY 2013

Go to www.forthecommondefense.org/reports to view detailed reports on Connecticut counties, cities, Congressional Districts, industries, small businesses and information on sources and methodology.


         BACKGROUND ON THE DEFENSE BUDGET CUTS: 2013-2021

  • Our military is carrying an unfair burden of deficit cuts. To date, our Defense budget has been hit with 50% of deficit reduction -- yet it accounts for less than 20% of total federal spending. As a result of these cuts, in 2012 President Obama limited U.S. military capability to fighting one "regional conflict" and one "holding action."
     
  • Sequestration Defense budget cuts of $500 billion, combined with previous Defense cuts of another $487 billion, will cut defense spending in local communities by 9% to 18% between 2013 and 2021.
     
  • These reports show how estimates of defense budget reductions from 9% to 18% could affect Connecticut with cuts in defense jobs and businesses. Ask your elected officials for ongoing updates on how these defense cuts will affect your community.
     
  • Alternative solutions have been proposed to maintain a strong defense, reduce our deficit and avoid tax increases. Elected officials have proposed that the President and Congress reduce mandatory entitlement spending and make cuts in the non-security programs in the Federal budget. Over 60% of federal spending goes to entitlements like Social Security, Medicare, Medicaid and now Obamacare.
 

StateCountyContract YearProduct or Service$ AmountReduction
   by 9.0%
Reduction
   by 18.0%
ConnecticutLitchfield2012ACFT Maint & Repair Shop Specilized Equip$14,255-$1,283-$2,566
ConnecticutLitchfield2012Adhesives$5,464-$492-$984
ConnecticutLitchfield2012Aircraft AC, Heating, And Pressurizing Equipment$27,726-$2,495-$4,991
ConnecticutLitchfield2012Aircraft Ground Servicing Equipment$9,585-$863-$1,725
ConnecticutLitchfield2012Aircraft Landing Gear Components$36,220-$3,260-$6,520
ConnecticutLitchfield2012Airframe Structural Components$502,494-$45,224-$90,449
ConnecticutLitchfield2012Ammunition, Over 30 MM Up to 75 MM$1,546,582-$139,192-$278,385
ConnecticutLitchfield2012Antennas, Waveguides & Related Equipment$20,810-$1,873-$3,746
ConnecticutLitchfield2012Bearings, Antifriction, Unmounted$2,248,140-$202,333-$404,665
ConnecticutLitchfield2012Bearings, Mounted$33,927-$3,053-$6,107
ConnecticutLitchfield2012Bearings, Plain, Unmounted$17,993-$1,619-$3,239
ConnecticutLitchfield2012Boxes, Cartons, And Crates$24,641-$2,218-$4,435
ConnecticutLitchfield2012Cable, Cord, Wire Assemblies: Comm Equip$124,504-$11,205-$22,411
ConnecticutLitchfield2012Centrifugals, Separators, And Press and Vac Filt$61,989-$5,579-$11,158
ConnecticutLitchfield2012Chemical Analysis Instruments$15,694-$1,412-$2,825
ConnecticutLitchfield2012Circuit Breakers$36,318-$3,269-$6,537
ConnecticutLitchfield2012Clothing, Special Purpose$81,946-$7,375-$14,750
ConnecticutLitchfield2012Coil, Flat, And Wire Springs$57,778-$5,200-$10,400
ConnecticutLitchfield2012Coils and Transformers$40,945-$3,685-$7,370
ConnecticutLitchfield2012Combination & Miscellaneous Instruments$72,846-$6,556-$13,112
ConnecticutLitchfield2012Connectors, Electrical$28,178-$2,536-$5,072
ConnecticutLitchfield2012Construction of Highways, Roads, Streets, Bridges, And Railways$26,906-$2,422-$4,843
ConnecticutLitchfield2012Converters, Electrical, Nonrotating$883,511-$79,516-$159,032
ConnecticutLitchfield2012Converters, Electrical, Rotating$160,000-$14,400-$28,800
ConnecticutLitchfield2012Custodial - Janitorial Services$7,287-$656-$1,312
ConnecticutLitchfield2012Driers, Dehydrators, And Anhydrators$22,020-$1,982-$3,964
ConnecticutLitchfield2012Electrical & Elct Boards, Cards & Asscted Hrdwre$836,324-$75,269-$150,538
ConnecticutLitchfield2012Electrical & Elct Properties Meas & Tst Instrumnts$45,693-$4,112-$8,225
ConnecticutLitchfield2012Electrical Contact Brushes & Electrodes$295,603-$26,604-$53,209
ConnecticutLitchfield2012Electrical Control Equipment$1,446,580-$130,192-$260,384
ConnecticutLitchfield2012Engineering Technical Services$455,060-$40,955-$81,911
ConnecticutLitchfield2012Fastening Devices$70,301-$6,327-$12,654
ConnecticutLitchfield2012Filters and Networks$3,204-$288-$577
ConnecticutLitchfield2012Fittings and Specialties; Hose, Pipe, Tube$83,003-$7,470-$14,941
ConnecticutLitchfield2012Fuel Oils$21,957-$1,976-$3,952
ConnecticutLitchfield2012Fuses, Arrestors, Absorbers, & Protectors$24,928-$2,244-$4,487
ConnecticutLitchfield2012Gas Generating and Dispensing Systems$7,721,683-$694,951-$1,389,903
ConnecticutLitchfield2012Gas Turbines and Jet Engines, ACFT & Comps$87,640-$7,888-$15,775
ConnecticutLitchfield2012Generators and Generator Sets, Electrical$175,529-$15,798-$31,595
ConnecticutLitchfield2012Hand Tools, Power Driven$10,405-$936-$1,873
ConnecticutLitchfield2012Hardware, Weapon System$49,684-$4,472-$8,943
ConnecticutLitchfield2012Hazard-Detecting Instruments & Apparatus$232,070-$20,886-$41,773
ConnecticutLitchfield2012Hazardous Substance Removal/Cleanup/Disposal SVCS$84,680-$7,621-$15,242
ConnecticutLitchfield2012Hose and Tubing, Flexible$4,565-$411-$822
ConnecticutLitchfield2012Industrial Furnaces, Kilns, Lehrs, & Ovens$3,890-$350-$700
ConnecticutLitchfield2012Installation of Eq/Alarm & Signal Systems$4,495-$405-$809
ConnecticutLitchfield2012Installation of Eq/Electrical & Elct Equip Comps$225,420-$20,288-$40,576
ConnecticutLitchfield2012Laboratory Equipment & Supplies$3,407-$307-$613
ConnecticutLitchfield2012Landscaping/Groundskeeping Services$277,648-$24,988-$49,977
ConnecticutLitchfield2012Lease or Rental of Eq/Electrical & Elct Eq Comps$1,750-$158-$315
ConnecticutLitchfield2012Lease or Rental of Eq/Miscellaneous Equipment$11,450-$1,031-$2,061
ConnecticutLitchfield2012Liq & Gas Flow, Liq LVL, & Mech Motion Meas Instru$69,366-$6,243-$12,486
ConnecticutLitchfield2012Luggage$35,226-$3,170-$6,341
ConnecticutLitchfield2012Maint & Repair of Eq/Medical & Dental Equipment$2,630-$237-$473
ConnecticutLitchfield2012Maint & Repair of Eq/Miscellaneous Equipment$246,019-$22,142-$44,283
ConnecticutLitchfield2012Maint & Repair of Eq/Ship & Marine Equipment$1,587-$143-$286
ConnecticutLitchfield2012Maint/Dams$10,947-$985-$1,970
ConnecticutLitchfield2012Maintenance of EPG Facilities - Gas$8,323-$749-$1,498
ConnecticutLitchfield2012Maintenance of Other Administrative Facilities and Service Buildings$31,349-$2,821-$5,643
ConnecticutLitchfield2012Medical & Surgical Instruments, Equip & Supplies$17,051-$1,535-$3,069
ConnecticutLitchfield2012Mineral Construction Materials, Bulk$14,004-$1,260-$2,521
ConnecticutLitchfield2012Minerals, Natural and Synthetic$11,196-$1,008-$2,015
ConnecticutLitchfield2012Mining, Rock Drilling, Earth Boring Equip, Related$91,314-$8,218-$16,437
ConnecticutLitchfield2012Misc Electric Power & Distribution Eq$153,732-$13,836-$27,672
ConnecticutLitchfield2012Misc Electrical & Electronic Components$55,011-$4,951-$9,902
ConnecticutLitchfield2012Miscellaneous Communication Equipment$28,457-$2,561-$5,122
ConnecticutLitchfield2012Miscellaneous Construction Equipment$20,140-$1,813-$3,625
ConnecticutLitchfield2012Miscellaneous Construction Materials$6,024-$542-$1,084
ConnecticutLitchfield2012Miscellaneous Engines and Components$91,025-$8,192-$16,385
ConnecticutLitchfield2012Miscellaneous Hardware$138,987-$12,509-$25,018
ConnecticutLitchfield2012Miscellaneous Maint & Repair Shop Specilized Eq$23,310-$2,098-$4,196
ConnecticutLitchfield2012Miscellaneous Power Transmission Equip$87,350-$7,862-$15,723
ConnecticutLitchfield2012Miscellaneous Ship and Marine Equipment$6,554,421-$589,898-$1,179,796
ConnecticutLitchfield2012Motors, Electrical$2,057,209-$185,149-$370,298
ConnecticutLitchfield2012MSL Aircraft Accessories and Components$73,045-$6,574-$13,148
ConnecticutLitchfield2012Nuts and Washers$500-$45-$90
ConnecticutLitchfield2012Optical Instruments, Test Equip, Comps & Accys$19,080-$1,717-$3,434
ConnecticutLitchfield2012O-Ring$9,103-$819-$1,639
ConnecticutLitchfield2012Other Buildings$3,665-$330-$660
ConnecticutLitchfield2012Other Special Studies & Analyses$10,000-$900-$1,800
ConnecticutLitchfield2012Outerwear, Men's$3,382-$304-$609
ConnecticutLitchfield2012Packing and Gasket Materials$46,538-$4,188-$8,377
ConnecticutLitchfield2012Power and Hand Pumps$365,374-$32,884-$65,767
ConnecticutLitchfield2012Pressure, Temp, & Humidity Meas & Contrling Instru$107,799-$9,702-$19,404
ConnecticutLitchfield2012Pulp and Paper Industries Machinery$31,140-$2,803-$5,605
ConnecticutLitchfield2012Relays and Solenoids$416,359-$37,472-$74,945
ConnecticutLitchfield2012Repair or Alteration of Highways/Roads/Streets/Bridges/Railways$9,409-$847-$1,694
ConnecticutLitchfield2012Repair or Alteration of Miscellaneous Buildings$5,487-$494-$988
ConnecticutLitchfield2012Repair or Alteration of Other Administrative Facilities and Service Buildings$3,911-$352-$704
ConnecticutLitchfield2012Resistors$44,896-$4,041-$8,081
ConnecticutLitchfield2012Rings, Shims, And Spacers$32,142-$2,893-$5,786
ConnecticutLitchfield2012Safety and Rescue Equipment$63,096-$5,679-$11,357
ConnecticutLitchfield2012Semiconductor Devices & Assoc Hardware$19,752-$1,778-$3,555
ConnecticutLitchfield2012Space Heating Equipment & Domestic Water Heaters$7,392-$665-$1,331
ConnecticutLitchfield2012Switches$1,120,996-$100,890-$201,779
ConnecticutLitchfield2012Telephone and/or Communications Services$5,604-$504-$1,009
ConnecticutLitchfield2012Torque Converters and Speed Changers$162,469-$14,622-$29,244
ConnecticutLitchfield2012Trailers$2,325,866-$209,328-$418,656
ConnecticutLitchfield2012Trash/Garbage Collection Srvcs-Incl Port San SVCS$3,319-$299-$597
ConnecticutLitchfield2012Travel Agent Services$44,840-$4,036-$8,071
ConnecticutLitchfield2012Truck and Tractor Attachments$4,527-$407-$815
ConnecticutLitchfield2012Valves, Nonpowered$234,662-$21,120-$42,239
ConnecticutLitchfield2012Valves, Powered$1,847,415-$166,267-$332,535
ConnecticutLitchfield2012X-Ray Equip & Sup: Medical, Dental, & Vet$86,893-$7,820-$15,641
TOTAL   $35,148,067-$3,163,327-$6,326,656

Data sources and more data available at www.governmentcontractswon.com, compiled from public data at www.fpds.gov

Created by the Center for Security Policy Defense Breakdown Economic Impact Report Generator (v.2.8.0-PoP) November 6, 2013 19:40:11 www.forthecommondefense.org